When a utility asks you to shift load, it is borrowing the flexibility a real emergency will require.

by: Andrew, Co-Founder at Blackout Briefing

Thermostats that pre-cool, factories that delay a shift, households that wait to run the dryer — demand response is how grids survive tight evenings now. The same muscle matters in a geomagnetic event, when operators need load down fast to protect voltage.

The request is about voltage, not about a moral on waste. Operators are buying margin so the machine stays inside what the equipment will tolerate. On a hot evening that margin is ordinary reliability. In a geomagnetic event it is margin against a stress the schedule did not include.

The peacetime version is voluntary, often paid, and announced. That is the easy repetition of the muscle. A harder version can arrive with less notice. A house that has never moved a flexible load will hear it as an insult. A house that has already skipped the dryer knows which loads were optional.

Enrolling, if your utility offers something simple, is a small civic act with a bill credit attached. Ignoring every conservation request and then expecting unlimited power in a storm is not a coherent position.

The credit is the reason many people sign. The operational point is that a movable load becomes visible to the people balancing the evening. If the particular program on offer looks like a gimmick, the underlying act remains: know what you would drop first, and drop it when asked.

The deepest version is using less by design: insulation, a smaller set of critical loads, equipment that fails soft. That is preparedness that pays you in August.

Fails soft means a device can give up without dragging the rest of the house, or the neighbors, with it. Insulation does not wait for an alert. A short list of critical loads is the list a troubled feeder or a small generator can actually carry. The summer bill is when you find out whether the design was real.

Sources

  1. PJM Implements Conservative Operations as Heat Wave Continues — PJM Interconnection · the article this brief was written from
  2. Evaluation of the Physical Security Reliability Standard and Physical Attacks on the Bulk-Power System — Federal Energy Regulatory Commission
  3. Electromagnetic Pulse and Geomagnetic Disturbance — Cybersecurity and Infrastructure Security Agency

More in Grid

Recent news